Project: Bovine-RV14A   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Jeff Lawson   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:601.5
Total Flight Time:
Start/Last Date:Jan 28, 2022 - No Finish Date
Engine:Lycoming YIO-390-EXP119 non-cert
Propeller:Hartzell G2YR/N7605W-2X 74 in. dia composite 2-blade
Panel:Dynon Skyview
 
Friendly URL: https://eaabuilderslog.org?s=Bovine-RV14A

Home or Last Project Picture

May 23, 2022     Priming and riveting right flap internals - (4 hours)       Category: Flaps
Today was the first day for priming parts. I've decided to use a light single coat of Rustoleum's self-etching metal primer for all of these parts, based on its convenience and recommendation by others. This primer also has the benefit that it dries in only 10 minutes, so it's very quick to get back to work.

After priming the spar, ribs, nose ribs, and flap hinge brackets, I started using my hand squeezer to set the first rivets on the assemblies used on the right flap. I also got some practice drilling out bad rivets after seeing a handful of them were incorrectly set crooked, smiley, or with a gap. However, I was able to successfully remove and re-squeeze those few rivets without any drama or damage to the pieces. Then I clecoed the parts all back to the spar.

What's next? I have to finish assembling the hardware parts on the flap hinge brackets and then set the special "double-flush" rivets tomorrow. Then I'll probably rivet what I can to the spar.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.